Below are very early drawings to give you an idea of what came out of the all-day workshop with Sunstructures Architects and 26 members of Northwest UU Church. Please remember these are just concepts. By Oct. 23, 2004, we will have a better rendering of our future addition.
Sunstructures' Site Plan, Conceptual
Sunstructures' Proposed Conceptual Building Space
Plan (based on our earlier Master Plan work)
The above shows our building and property from above. You can see how it relates to neighboring buildings and the service drive of Northwestern Highway. The light orange line with arrowheads represents the sweep of the sun at our location at different times of the year.
The building plan above gives us a very early look at one possibility for our new space.
Below are the earlier drawings of a different architect's master plan for the church, which turned out to be too expensive, and Beata L's adaption of that plan. These are here for historical reference.
Architect's Original Conceptual Plan (Plan A1)
Beata's Adaptation of the Architect's Plan (Plan A2)